For sure Larry. I followed this project from the beginning. I am looking forward to flying into KXWA once an artist can put a package together for X Plane.
Although KXWA shows on ESRI image, airport data is not yet available through FAA or WED. As soon as the runway data is posted, I or another artist will surely get to work on it, Paul.
This scenery should stay the same due to the closure of this airport in 2019. A new airport is under construction. Due to open in 2019
Apparently according to https://xwaproject.com/ the new airport at Williston. ND will become operational Oct 10 2019. Construction cameras here: https://www.senserasystems.com/public/cameras/XWA
For sure Larry. I followed this project from the beginning. I am looking forward to flying into KXWA once an artist can put a package together for X Plane.
Although KXWA shows on ESRI image, airport data is not yet available through FAA or WED. As soon as the runway data is posted, I or another artist will surely get to work on it, Paul.
Thanks Jim.