pete80602 commented on June 26, 2020 7:08 PM

Have checked out to bring airport configuration up to published 2020 layout. I expect to submit a revised airport soon since a lot of work has been done so far including: • redoing taxiways to reflect changes since 2018 • redrawing lines to be consistent with actual practices • replacing some structures with facades to better reflect footprints of structures seen in Slippy Map and other sources • adding taxi routes • adding various details to improve the verisimilitude of the experience

You must be logged in to participate in the discussion